This is a former, or nearly former, government office building at 90 Elgin Street, here in Ottawa. I developed urban design guidelines for a new building on this site, but had not heard anything about the project until recently seeing the deconstruction start.
It seems a waste to demolish the building, but there are many technical constraints, such as floor to floor heights and seismic ( earthquake) structural stiffening that make it more practical to construct a new building.
So - another architectural anatomy lesson for me to draw.
Showing posts with label deconstruction. Show all posts
Showing posts with label deconstruction. Show all posts
Sunday, 14 August 2011
Thursday, 16 June 2011
Deconstruction

This week my old friends from Doran Construction have been taking a building apart (demolition is so last century) to clear a site for a new condominium building. They have been fastidiously separating metal from concrete which takes some time, so luckily for me, I have been able to return a few times to see the progress...or is it un-progress? I've been fascinated by this building anatomy lesson , as it makes a lot more sense to me than disecting frogs did in grade 9. My collegue Scott sees it as a terrible waste as, "the greenest building is an existing building", but I'm afraid I think it is more interesting in it's deconstruction than it has been in its life as a revenue producing structure.
Subscribe to:
Posts (Atom)


